  • Can multiple ProGet be installed with the integrated web server and placed behind a Windows Server 2016 NLB configuration?

    I am aware of the "High Availability Mode" and "Load Balancing Mode" which require IIS, but I am wondering if the same can be achieved by placing standalone installations behind an NLB.

    Related to the first question - what happens if you install multiple standalone nodes and point them to the same database on a clustered SQL environment?

    Product: ProGet
    Version: 4.6.7



  • Please note that this (or any multi-node) installation requires a ProGet Enterprise or ProGet Load Balanced License to be purchased. ProGet Basic and ProGet Free only permit a single server to be used in a single installation.

    That said, we recommend IIS because it's the easiest to support (by your own network admin team) and has many configuration options. In theory, you could probably use the integrated server.

    A HA configuration ought to use a SQL Cluster, otherwise you have a single point of failure.