Inedo Community Forums Forums
    • Recent
    • Tags
    • Popular
    • Login

    Welcome to the Inedo Forums! Check out the Forums Guide for help getting started.

    If you are experiencing any issues with the forum software, please visit the Contact Form on our website and let us know!

    Listener for Approval Needed not sending emails

    Scheduled Pinned Locked Moved Support
    buildmaster
    3 Posts 2 Posters 9 Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • J Offline
      jstarbird_7831
      last edited by

      I have an app setup for an approval and setup a listener to email the person. When the deployment reached the Stage that needs the approval I scheduled the deployment but no email was ever sent to the user.
      We send emails from the server all the time so it's not a setup issue for that.

      The user did see the approval needed when connected to the BuildMaster server and looked at My Approvals so just the email aspect didn't work.

      The deployment was scheduled for immediate deployment once the approval was received.

      Product: BuildMaster
      Version: 5.8.3

      1 Reply Last reply Reply Quote 0
      • benB Offline
        ben inedo-engineer
        last edited by

        Hello Jon,

        Is the Approval Required event listener filtered by pipeline stage?

        Approval Required listens for Build Promotion Completed events, so the pipeline stage filter should have the name of the stage of the pipeline immediately before the approval gate, not the stage that is blocked by the approval gate.

        1 Reply Last reply Reply Quote 0
        • J Offline
          jstarbird_7831
          last edited by

          Ben,
          I didn't set it for any particular stage. Based on what you're saying though I think the issue was that didn't have the Listener in place when the app had completed the previous stage.
          I assumed the email would only go out when the Stage the approval was attached to was initiated for deployment but it sounds like it would do so when the previous stage completes, is that correct?

          1 Reply Last reply Reply Quote 0

          Hello! It looks like you're interested in this conversation, but you don't have an account yet.

          Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.

          With your input, this post could be even better 💗

          Register Login
          • 1 / 1
          • First post
            Last post
          Inedo Website Home • Support Home • Code of Conduct • Forums Guide • Documentation