Welcome to the Inedo Forums! Check out the Forums Guide for help getting started.
If you are experiencing any issues with the forum software, please visit the Contact Form on our website and let us know!
How many jobs can BuildMaster run in parallel?
-
We're starting to get a few applications in now and finding that at times jobs getting blocked because others are already running.
Is it possible to run more than 2 (seems to be the limit) at any one time?
Product: BuildMaster
Version: 4.6.2 -
UPDATE: This limitation no longer exists in BuildMaster v5 (OtterScript) Plans.
There is no limit to the number of executions that BuildMaster can run in parallel; however, only a single remote action can run on the same remote server/agent at a time.
This means that, for example, if you create a build of multiple applications at once, and all of them build on the same build server, only one of those applications will be built at a time. You can improve this behavior by using server pools if you'd like if you have multiple build servers you would like to utilize. In exceptional cases, you could install multiple agents on the same machine (on different ports), and put those in a server pool.
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login